C4CH0TF1 - 206 5 DOOR SALOON
REPLACEMENT CENTRE PILLAR (5-DOOR)
WARNING : all the scoured areas must be protected by the approved electrolytic re-zincing process .
IMPERATIVE : observe elementary health and safety rules (wearing of filter mask for organic fumes - work in a ventilated area) .
1 - COMPLEMENTARY OPERATION(S)
Replacement :
Removal-fitting :
Remove-refit trim :
Detach the electrical harnesses .
2 - IDENTIFICATION OF REPLACEMENT PARTS
Body side front part .
Roof bow cantrail .
(1) Centre post stiffener assembly .
(2) Centre pillar inner panel .
3 - COMPOSITION
Body side front part .
Roof bow cantrail .
(1) Centre pillar stiffener .
(2) Centre pillar inner panel .
(3) Tapping plate retainer .
(4) Tapping plate .
(5) Welded nut .
(6) Welded pin .
4 - PART(S) REQUIRED TO CARRY OUT THE OPERATION
Part passenger compartment front section .
Part roof bow inner panel .
(1) Centre pillar stiffener .
(2) Centre pillar inner panel .
5 - PREPARATION OF NEW PARTS
Mark out then cut with a 1 mm thick grinding wheel (Final cut) .
Mark out then drill 6,5 mm holes for later plug welding .
Mark out then cut with a 1 mm thick grinding wheel (Final cut) .
Drill 6,5 mm holes for later plug welding .
Drill to 6,5 diameter for later plug welding .
Drill 6,5 mm holes for later plug welding .
6 - CUTTING OUT
Mark out then cut with a 1 mm thick grinding wheel (At A) .
Cut out by milling out the spot welds (At B) .
Cut out by milling out the spot welds .
Mark then cut the centre pillar assembly using a 1 mm thick grinding wheel (Provisional cut) .
Cut out by milling out the spot welds (At A) .
Mark out then cut with a 1 mm thick grinding wheel (At B) .
Cut out by milling out the spot welds .
Cut with a 1 mm thick wheel .
Remove the component .
Cut out by milling out the spot welds .
Remove the component .
7 - SEPARATING
Prepare the mating edges .
Prepare the mating edges .
Protect the edges of the original and the new part with welding primer .
8 - ADJUSTMENT
Position :
Check the clearances .
Remove :
Check the clearance : X = 1360 ± 1 mm .
Mark out the cut .
Mark the cuts .
Mark out the cut .
Remove :
Clean up the cut (Final cut) .
Clean up the cut (Final cut) .
Clean up the cuts (Final cuts) .
9 - WELDING
Fit the centre pillar inner panel .
Spot weld (Using AB1 equipment) .
Position the centre pillar stiffener .
MIG stitch weld .
MIG plug weld (At A) .
Grind the plug welds .
Spot weld (At B) .
(Using AB1 equipment) .
MIG plug weld (At C) .
Grind the plug welds .
Spot weld (At D) .
(Using AB1 equipment) .
MIG stitch weld (At E) .
Grind the welds .
MIG plug weld (At F) .
Grind the plug welds .
MIG stitch weld (At G) .
Grind the welds .
Spot weld (At H) .
(Using AB1 equipment) .
Spot weld (Using AB1 equipment) .
10 - FINISHING
Lead load .
Lead load .
11 - SEALING
Apply mastic (to be smoothed with a brush) .
12 - PROTECTION
Apply a coat of anti-chip compound .
Spray liquid wax .
Spray liquid wax .