B1HG2SK1 - 206 DW10TD ENGINE
REMOVAL - REFITTING TURBOCHARGER
1 - REMOVAL
Remove :
Remove the shields under the power train .
Drain the gearbox .
IMPERATIVE : remove the exhaust pipe to avoid damaging the flexible hose; this cannot withstand the torsion, traction or bending tensions caused by the removal of one of the power train supports .
Remove :

Remove the bolt (1) .
Uncouple The pipes (2) - (3) .

Remove :
Plug the turbo inlet and outlet openings .

Remove the support (8) .
Move aside : The oil unions (6) -(7) .
Remove :
POWER STEERING
Remove the clutch housing closing plate .
ALL MODELS
Tilt the engine forwards .
Remove : The turbocharger (10) .
2 - REFITTING
Check that no foreign bodies are present ; In the induction system .

IMPERATIVE : always renew ; the nuts (9) .
Fit the turbocharger (10) .
Tighten :
Tightening torque(s) :
Refit the support (8) .
Tighten :
Tighten the union (6) to 4.75 da.Nm .
Position : The pipe (7) .
Continue the fitting operations in the reverse order to removal .

Refit the torque reaction link (17) .
Tighten :
IMPERATIVE : always renew : the exhaust clip .
Fit : The exhaust pipe .
Fill the gearbox .
Top up the coolant level .